Mounting set for basic structure and Grid
To assemble the basic structure and lift Multi-Lane Grid
Observe the assembly and operating instruction
black steel duro
Delivery time approx. 6 weeks, ex works Weil am Rhein, Germany
Consisting of: 1x load lift for raising connector for basic structure
4x chain hoist with accessories for lifting Multi-Lane Grid that was pre-assembled on the floor.